VFM® Installation Highlights and Video
INSTALLATION INSTRUCTIONS
Position each VFM® panel with payout spool and/or fiber management spool at Remote Radio Heads on each floor, to be run to the head end.
Pull FIRST from floor FURTHEST from the head end, attaching cable from additional floors as you work towards the head end.
Closely monitor each VFM® spool on each floor to avoid excess slack in the pull, and to ensure the cable’s minimum bend radius is not violated.
Finish runs to head end. Secure fiber to ensure bend radius is not violated.